Structural design and drawings · Fern Bay NSW
In short: Our client in Fern Bay needed structural drawings for alterations and additions to an existing house, including removing part of a porch. We designed mass-concrete piers with adjustable steel stumps, LVL floor beams and joists, glulam and LVL roof beams, plywood bracing and the connections to the existing frame, in an 11-sheet set ready to submit for approval.

- Service
- Structural design and drawings
- Location
- Fern Bay NSW
- Completed
- September 2026
- Scope
- Alterations and additions to an existing house, with part of an existing porch removed
- Site class
- Presumed Class M, to be confirmed by the contractor before excavation
- Founding
- Piers at least 1000 mm deep and down to hard strata; all footings into stiff natural soil or rock of at least 150 kPa allowable bearing capacity
- Footings
- 450 mm diameter mass-concrete piers carrying 75 x 75 x 4 mm SHS adjustable-head steel stumps
- Floor
- 240 x 42 mm LVL15 beams and 190 x 45 mm LVL13 joists at 450 mm centres
- Roof beams
- Two 300 x 85 mm GL18 glulam and two 240 x 45 mm LVL15
- Wind classification
- N2
- Standards referenced
- AS 1684, AS 1720, AS 2870-2011, AS 3600-2018, AS 3700-2018, AS 4100-2020, NCC 2022 Volume Two
- Drawings
- 11 sheets
The brief
Our client in Fern Bay planned alterations and additions to an existing house. Part of an existing porch was to be demolished and the new work built onto the existing structure. They needed structural drawings for the new footings, floor, roof beams and wall bracing, and for how the new work connects to the existing frame. The drawings are to be read with the architectural plans and specifications.
Why it needed a structural engineer
New floor and roof loads have to travel through the new framing and the existing frame into footings that suit the ground. Under NCC 2022, the ABCB Housing Provisions require the foundation where footings are to go to be classified in accordance with AS 2870. No geotechnical report was among the job's documents, so the foundation design is based on a presumed Class M site, and the drawings ask for that to be confirmed before digging.
The work also changes how loads reach the existing structure. New posts and triple studs bear on the existing frame and bottom plates, and new roof beams carry the roof where the alterations need them. Those members, and their fixings to the old frame, are sized on the drawings rather than left to be worked out on site.
What we designed
We prepared an 11-sheet structural drawing set: a cover sheet, general notes, the existing and demolition plan, the foundation, floor framing, roof framing and wall bracing plans, three sheets of connection details, and a wall framing and lintel schedule.
- Ground. The foundation is designed for a presumed Class M site, which the contractor must confirm before excavation; the design is to be revised if actual site conditions differ. Ground conditions can vary over short distances, so pier depths are to be adjusted to suit. Whatever depth is specified, every footing must reach stiff natural soil or rock with an allowable bearing capacity of at least 150 kPa. If groundwater is found at the design depth of a footing or pier, the contractor is to contact the engineer straight away.
- Piers and stumps. The P1 piers are 450 mm diameter mass concrete, at least 1000 mm deep and taken down to hard strata. Each carries a Unipier adjustable-head steel stump (75 x 75 x 4 mm SHS) with an L bracket and ant cap, installed to the manufacturer's specifications. The stump is set at least 600 mm into the pier on a welded 150 x 150 x 6 mm base plate and bolts to the timber beam above with two M12 bolts.
- Floor. The new floor framing is 240 x 42 mm LVL15 floor beams (FB1) carrying 190 x 45 mm LVL13 joists (FJ1) at 450 mm centres, with one row of blocking. Double joists go under load-bearing walls, point loads and studs, and openings get double joists or rafters along every edge. The general notes set design live loads of 1.5 kPa for internal floors and 2.0 kPa for external floors.
- Posts and studs. C1 columns are 90 x 90 mm hardwood resting on the existing frame, and TS studs are three 90 x 45 mm studs resting on the existing bottom plate. New posts fix to the existing floor through a 12 mm vertical steel plate on a base plate chemically anchored 150 mm into the existing floor: either a 12 mm base plate with four M12 anchors and two M10 through-bolts, or a 16 mm base plate with two M16 anchors and two M12 through-bolts.
- Roof. Trusses follow the manufacturer's specifications. Roof beam RB1 is two 300 x 85 mm GL18 glulam members and RB2 is two 240 x 45 mm LVL15 members. Beams spanning more than 4 m with no supporting column get stud clusters at both ends.
- Walls and bracing. The site wind classification is N2. New Type B structural plywood bracing panels are each at least 900 mm long, nailed at set spacings to the plates, edges and studs, and each panel's bottom plate needs a 13 kN capacity connection at each end and at no more than 1200 mm centres. M12 threaded rods go either side of each bracing panel and each opening, at 1200 mm centres. All other bracing is to AS 1684.
- Connections. Beams sit on 12 mm steel post caps, with M16 bolts at end connections and M12 bolts at mid connections. Where one beam meets another, 100 x 100 x 8 mm angles go to each side with three M12 bolts to each beam. Joists and rafters are fixed to beams with approved joist hangers or framing connectors, and double beams are laminated to a nail schedule set by member depth.
- Lintels. The wall framing and lintel schedule sizes window and door lintels by clear span up to 3000 mm, and openings over 3.0 m get triple studs on each side.
| Mark | Element | From the drawings |
|---|---|---|
| P1 | Pier | 450 mm diameter mass concrete, at least 1000 mm deep and down to hard strata |
| UP | Steel stump | 75 x 75 x 4 mm SHS adjustable-head stump with L bracket and ant cap |
| C1 | Column | 90 x 90 mm hardwood, resting on the existing frame |
| TS | Studs | Three 90 x 45 mm studs, resting on the existing bottom plate |
| FB1 | Floor beam | 240 x 42 mm LVL15 |
| FJ1 | Floor joist | 190 x 45 mm LVL13 at 450 mm centres, one row of blocking |
| RB1 | Roof beam | Two 300 x 85 mm GL18 glulam |
| RB2 | Roof beam | Two 240 x 45 mm LVL15 |
| B | Bracing panel | Type B structural plywood, at least 900 mm long |
Concrete is specified at 32 MPa to AS 3600-2018 unless noted otherwise, and steelwork is to AS 4100-2020.
The result
Our client received an 11-sheet structural drawing set with the demolition, piers, floor framing, roof beams, bracing and the connections to the existing house detailed. It sets out the member sizes, pier depths and fixings for approval and, once approved, for the builder.
The drawings also set out what has to be checked on site. The design assumes the existing structure can carry the loads from the new work, and the contractor is to verify this before starting or obtain a structural assessment from a specialist structural engineer. The general notes ask the client to engage a geotechnical consultant to verify the foundation soil conditions before construction, and the builder to confirm all dimensions, existing conditions and obstructions before ordering materials. Inspections are to be confirmed 72 hours in advance.
For another set on piers, see our structural drawings for a house extension on piers in Charlestown.
Planning alterations or additions around Newcastle?
Our structural design service prepares residential structural drawings for extensions and renovations, and alteration design for additions to existing structures. Send us your architectural plans, any geotechnical or soil report, and photos of the existing house where the new work will join it, and we'll give you a quote. Once building starts, our structural inspections service includes frame and construction stage inspections. Our service areas page lists the Newcastle suburbs we cover; if yours isn't listed, call us. You can request a quote online or call 02 4091 1900.
Photos and drawings




From the report
Sample pages from what the client received (personal details removed).

Frequently asked questions
What does Class M mean for footings?
Class M is a moderately reactive clay or silt site, which can experience moderate ground movement from moisture changes. That is the general definition in Table 4.2.2 of the ABCB Housing Provisions under NCC 2022. Clause 4.2.2 requires the foundation to be classified in accordance with AS 2870, and a Class M site where deep-seated movement is expected is classed M-D, which takes footing design outside the Housing Provisions and back to AS 2870.
Which council handles building in Fern Bay?
Port Stephens Council. Fern Bay is in the Port Stephens local government area, while neighbouring North Stockton is in the City of Newcastle. The two councils prepared the Fern Bay and North Stockton Strategy together, finalised in 2020, to guide future development in the area.
Do alterations and additions to a house need council approval in NSW?
They may be able to be approved as complying development instead, if they meet the Housing Code's standards. The NSW Planning Portal says the Housing Code covers alterations and additions to a home that meet its development standards, such as maximum building height, minimum setbacks and minimum landscaping, in zones R1, R2, R3, R4 and RU5. If a proposal can't meet those requirements, a development application has to be lodged with the local council.